Bidding Documents 2020
Procurement of Supplies and Materials for the Repair/Improvement of Audio Visual Room, Library, and Department of Forestry Faculty Room with Rest Room at Upper Campus and Department of Teacher Education Faculty Room with Rest Room at Lower Campus of BiPSU Biliran Campus
Repair of the BiPSU Main Campus Drainage System
- Bidding Document
- Bid Bulletin No. 1: Reiteration on the Use of the Philippine Bidding Document (2020 Edition)
Completion of the Renovation and Repair of BiPSU Technology Building
- Bidding Document
- Bid Bulletin 1: CONDUCT OF THE VIDEOCONFERENCE FOR THE BID OPENING OF THE PROJECT “COMPLETION OF THE RENOVATION AND REPAIR OF BIPSU TECHNOLOGY BUILDING”
- Bid Bulletin 2: CHANGE OF SCHEDULE FOR THE BID OPENING OF THE PROJECT “COMPLETION OF THE RENOVATION AND REPAIR OF BIPSU TECHNOLOGY BUILDING”
- Bid Bulletin 3: SUBMISSION OF OFFICIAL RECEIPT AS PROOF THAT THE BIDDER HAS APPLIED FOR RENEWAL OF MAYOR’S/BUSINESS PERMIT
Completion of BiPSU Automotive Laboratory Building
- Bidding Document
- Bid Bulletin 1: CONDUCT OF THE VIDEOCONFERENCE FOR THE BID OPENING OF THE PROJECT “COMPLETION OF BIPSU AUTOMOTIVE LABORATORY BUILDING”
- Bid Bulletin 2: CHANGE OF SCHEDULE FOR THE BID OPENING OF THE PROJECT “COMPLETION OF BIPSU AUTOMOTIVE LABORATORY BUILDING”
- Bid Bulleting 3: SUBMISSION OF OFFICIAL RECEIPT AS PROOF THAT THE BIDDER HAS APPLIED FOR RENEWAL OF MAYOR’S/BUSINESS PERMIT
Construction of 3-Storey Academic and Research Building
- Bidding Document
- Bid Bulletin 1: CONDUCT OF THE VIDEOCONFERENCE FOR THE BID OPENING OF THE PROJECT “CONSTRUCTION OF THREE-STOREY ACADEMIC AND RESEARCH BUILDING (BILIRAN CAMPUS)”
- Bid Bulletin 2: CHANGE OF SCHEDULE FOR THE BID OPENING OF THE PROJECT “CONSTRUCTION OF THREE-STOREY ACADEMIC AND RESEARCH BUILDING (BILIRAN CAMPUS)”
- Bid Bulletin 3: SUBMISSION OF OFFICIAL RECEIPT AS PROOF THAT THE BIDDER HAS APPLIED FOR RENEWAL OF MAYOR’S/BUSINESS PERMIT
================================================================================
- Completion of Three (3) Storey Ceramics Building (Phase II) — BiPSU main Campus
- Renovation /Repair of BiPSU Gymnasium (Phase III)
- Upgrading of BiPSU Electrical System (Main Campus & Biliran Campus)
- Repair of Dormitory Building — BiPSU Biliran Campus
- Continuation of Roofing System for One (1) Basketball Court, Two (2) Volleyball Courts and One (1) Lawn Tennis
- BiPSU Biliran Campus Water System Improvement
- ARPA-RADAR SIMULATOR (Full Mission Ship Bridge Simulator) with Complete Accessories